Civil · Structural Design

Bridge Structural Analysis & Design

Intermediate 5 weeks 35-60 hours

Design a truss bridge, predict the load it can take, then build it and load it until it breaks. Compare what happened to your analysis.

Major

Civil

Focus area

Structural Design

Total hours

35-60 hours

What you'll need

  • load cell 5kg with HX711 amplifier weight sensor kit
  • Arduino Uno R3 ATmega328P microcontroller board
  • balsa wood strips and sheets pack
  • dial indicator gauge 0.001 inch deflection measurement
  • calibration weight set for testing
  • wood glue and spring clamp set
Shop these parts on Amazon
Shop the parts on Amazon

As an Amazon Associate, I earn from qualifying purchases.

Steps

  1. Design a truss bridge and calculate member forces and expected failure load.
  2. Build the bridge from balsa strips using wood glue and clamps.
  3. Set up the load rig with the load cell and dial indicator at midspan.
  4. Add load in steps and record deflection at each step.
  5. Load to failure and note where and how it broke.
  6. Compare measured results to your analysis and document the project for your portfolio.

What to photograph for your portfolio

  • Truss bridge build
  • load-deflection curves
  • failure load vs prediction
  • member analysis

Resume bullet starters

Copy one, then swap in your own numbers.

  • Designed a truss bridge and predicted failure at [X] lb

  • Load-tested it to failure at [X] lb while measuring deflection

  • Explained the gap between predicted and actual failure

Skills you'll show off

Structural analysismechanical testingtruss designFEA validation