Mechanical · MEP (HVAC Systems)
Commercial Building HVAC Design
Intermediate 5 weeks 35-60 hours
Build a small duct system where one fan feeds two or three zones. Change damper positions and measure how airflow and temperature shift in each zone.
Major
Mechanical
Focus area
MEP (HVAC Systems)
Total hours
35-60 hours
What you'll need
- 12V DC centrifugal blower fan
- DHT22 AM2302 temperature humidity sensor module 3 pack
- MG996R metal gear servo motor for damper control
- Arduino Mega 2560 R3 microcontroller board
- flexible ducting hose 4 inch
- anemometer wind speed sensor for Arduino 0-5V output
Shop the parts on Amazon
As an Amazon Associate, I earn from qualifying purchases.
Steps
- Build a scaled duct system feeding 2 or 3 zones from the blower fan.
- Add a servo-driven damper and temperature sensor in each zone.
- Measure airflow at each zone outlet with the anemometer.
- Test how different damper positions change airflow and zone temperatures.
- Find the damper settings that balance the zones.
- Chart the results and document the system for your portfolio.
What to photograph for your portfolio
- Ducted demo build
- zone temperature logs
- damper vs airflow tests
- balancing analysis
Resume bullet starters
Copy one, then swap in your own numbers.
Built a scaled duct system with servo dampers and temperature sensors in [X] zones
Balanced airflow across zones within [X]%
Charted how damper position changed zone temperature
Skills you'll show off
HVAC designairflow balancingsensor loggingductwork principles