Industrial · Process Optimization

Lean Manufacturing & Value Stream Mapping

Beginner 3 weeks 20-30 hours

Pick a real process, like a restaurant kitchen or a print shop, and map every step. Time each one, find the waste, and draw what a better version would look like.

Major

Industrial

Focus area

Process Optimization

Total hours

20-30 hours

What you'll need

  • Software only - Draw.io or free VSM tools, Excel templates

Steps

  1. Pick a real process to study, like a restaurant kitchen or campus print shop.
  2. Walk the process and record each step's cycle time and wait time.
  3. Draw a current-state value stream map.
  4. Calculate takt time, total lead time, and value-added time.
  5. Identify waste and draw a future-state map with your improvements.
  6. Document both maps and your recommendations for your portfolio.

What to photograph for your portfolio

  • Current state VSM
  • future state VSM
  • waste analysis
  • metrics before/after
  • improvement timeline

Resume bullet starters

Copy one, then swap in your own numbers.

  • Mapped a [X]-step process and measured cycle time and wait time at each step

  • Found that only [X]% of total lead time added value

  • Designed a future-state map that cuts lead time by [X]%

Skills you'll show off

Lean manufacturingprocess analysisVSMcontinuous improvementkaizen

Enjoying the site?

Every tool here is free. If it helped you, you can buy me a coffee.

Buy me a coffee