Industrial · Process Optimization
Lean Manufacturing & Value Stream Mapping
Beginner 3 weeks 20-30 hours
Pick a real process, like a restaurant kitchen or a print shop, and map every step. Time each one, find the waste, and draw what a better version would look like.
Major
Industrial
Focus area
Process Optimization
Total hours
20-30 hours
What you'll need
- Software only - Draw.io or free VSM tools, Excel templates
Steps
- Pick a real process to study, like a restaurant kitchen or campus print shop.
- Walk the process and record each step's cycle time and wait time.
- Draw a current-state value stream map.
- Calculate takt time, total lead time, and value-added time.
- Identify waste and draw a future-state map with your improvements.
- Document both maps and your recommendations for your portfolio.
What to photograph for your portfolio
- Current state VSM
- future state VSM
- waste analysis
- metrics before/after
- improvement timeline
Resume bullet starters
Copy one, then swap in your own numbers.
Mapped a [X]-step process and measured cycle time and wait time at each step
Found that only [X]% of total lead time added value
Designed a future-state map that cuts lead time by [X]%
Skills you'll show off
Lean manufacturingprocess analysisVSMcontinuous improvementkaizen